model-writtenrun 6231 - may be wrong, links go to the source messages. Commit-by-commit LLM analysis is in the Commits dialog.
- Soumyadeep Chakraborty reported an issue discovered with Ashwin while developing a TAP test: changing recovery_min_apply_delay during an existing wait did not update that wait, and he proposed recalculating the deadline inside the recovery loop with a regression test in #1.
- Kyotaro Horiguchi tested the patch successfully and suggested resetting the parameter to DEFAULT and moving the test to the end in #2; Soumyadeep incorporated those suggestions in #3 and subsequently added a RecoveryApplyDelay wait-event check alongside a rebase in #4.
- Michael Paquier endorsed the timestamp-based fix and wait-event synchronization but found that the test could pass without the fix, requesting clearer comments and explicit replay catchup in #5.
- Soumyadeep updated the comments and catchup call and moved the test before the recovery-pause tests in #6, reporting that this placement made the test hang without the fix and pass with it.
- Michael committed the backend portion of #6 as e4ba1005c0, with comment edits and no regression test; in #7, he explained that intervening primary activity caused the test-order dependency and that brittle synchronization and potentially long waits justified dropping the test while backpatching the fix.
- Soumyadeep accepted the explanation and test removal in #8, leaving the backend fix committed and backpatched with no further revision pending in this thread.