Filter:

Commits in week 45 (Nov 02 - Nov 08, 2026)

Commits5 commits of which 3 backported
1Author
4Committer
4Reviewer
1Reported by
0Co-author
CreditCommitBranchesThread(s)Committed
AuthorReported bydoc PG 19 relnotes: add item about shared parallel vacuum cost
d60d7f42committed by Bruce Momjian
REL_19_STABLE19rc2
First draft of PG 19 release notesNov 07, 2026
CommitterReviewerBackportedDetach injection point at the end of repack_dropped isolation test.
92a74e26
masterunreleasedREL_19_STABLE19rc2
Fix "unexpected logical decoding status change" error; from concurrent logical decoding activationNov 06, 2026
CommitterReviewerBackportedStabilize 051_effective_wal_level.pl.
f1e25929
masterunreleasedREL_19_STABLE19rc2
Fix "unexpected logical decoding status change" error; from concurrent logical decoding activationNov 06, 2026
CommitterReviewerAdd REPACK progress phases for logical decoding setup.
51ae21aa
masterunreleased
Add REPACK progress phases for logical decoding setupNov 02, 2026
CommitterReviewerBackportedMake parallel vacuum processes share the cost limit.
8628df88
masterunreleasedREL_19_STABLE19rc2
Parallel vacuum: workers together with leader could overrun cost budgetNov 02, 2026